Value-Design / Value-Engineering Services
LDA provides cost and quality controls for every project that we
serve. We approach cost control and value engineering as conscious
parts of the design effort. We believe that every project should
enjoy the benefits of efficient and economical design and engineering
for all building systems.
Cost Control & Value Engineering
LDA works closely with construction professionals to create an
accurate budget that is monitored during the entire course of a
project. To effectively prevent after-the-fact cost cutting, we
recommend constant cost review from the earliest stages of design.
Cost information is a design tool that should be used in parallel
with other design devices. We have had considerable experience in
design-build construction contracts, design-assist construction,
and negotiated bid projects that have been successfully completed
under this philosophy, for the entirety of our 51-year history.
Project Phasing
In a similar manner, construction phasing and scheduling is a conscious
pre-design effort that recognizes the need to provide phasing, either
for budgetary reasons, or for assuring the continuity of certain
building functions. LDA recognizes that important decisions will
result from a need to provide a specified construction sequence.
It is easier and more effective to design around the anticipated
phases of a project than it is to find ways to divide out pieces
in an after-the-design attempt at phasing. LDA has successfully
designed fast-track projects, phased construction spanning a period
of several years, and projects with elective alternates.
Quality Controls
The control and balance of quality is an integral part of managing
the cost of any project. It is convenient to downgrade the quality
of any product or assembly that may be used on a project, but the
project will be forever adjudged "cheap" by that one glaring
weak element. LDA considers the balance of quality to be more important.
The deliberate calibration of the entirety of a project to meet
a uniform level of quality is essential. As the budget is established
early, so too is the level of quality. This is another benefit of
early and constant cost monitoring.
Contract Administration
One of the more common tools in publicly and openly bid projects
is the desire to afford the general contractor more latitude in
"shopping." This is often done using open specifications,
listing multiple equivalent products, or using industry standards
or performance specifications. LDA approaches each of these cautiously,
using the appropriate method for each product or assembly. We are
aware that the use of these various techniques requires diligent
oversight during construction.
|